Aromist Installation Requirements Installation of your Aromist steam shower module is straightforward and simple, but there are a few things to bear in mind when planning your purchase. Space and Installation
 For hassle free installation and servicing of the Aromist range a 600mm space must be left around the unit, as illiustrated by the diagrams below. 
It is strongly recommended that the modules are installed on ceramic flooring. Tiling should be done first and then the module installed and connected. Services
 The services required for installation are hot and cold water; 16amp power supply and a 300mm waste outlet. If the telephone is to be used, a telephone extension line provision must be made. Water Pressure
 Hot and cold water supplies must be high pressure; 3 bar pressure. This is typically achieved by using one of the following methods - Combination boiler
- Pressurised cylinder
- 3 bar pressurised negative head pump such as:
Stuart Turner Monsoon Salamander ESP CPV
Warranty
 All Aromist steam showers are covered by a three year limited domestic warranty and a one year limited commercial warranty |